Layers
Stops
Line Statistics
Line Statistics
Avg moving: 19.7 km/h Avg trip: 12.1 km/h
Median moving: 19.4 km/h Median trip: 11.7 km/h
Peak: 33.2 km/h P25: 14.5 ยท P75: 24.5
Stops: 13 total Total delay: 438s
Tram stops:3 × avg 17s = 50s
Traffic lights:3 × avg 24s = 71s
Combined:7 × avg 45s = 317s
Avg wait per stop: 34s
Trip duration scenarios:
Current avg: 16:57
Best case (no TL + no bottlenecks):12:57 (-4:00, -23.6%)
Signal priority (no TL waits):12:57 (-4:00, -23.6%)
Worst case (all reds):16:57 (+0:00, +0.0%)
Speed-Space Diagram